01 / The basics
What goes into a good driveway
Your driveway takes more abuse than any other slab on your property. It carries vehicle weight every day, deals with freeze-thaw cycles or summer heat, and sits right where everyone can see it. A good driveway starts below the surface, with a compacted base, the right thickness, and reinforcement where loads are heaviest.
Most driveway jobs are a new pour, a full tear-out and replacement, or an extension such as a parking pad or a wider apron.
02 / Budgeting
What affects the cost
01
Size and thickness
02
Tear-out and haul-away
03
Finish: broom, exposed aggregate or stamped
04
Access for trucks and equipment
03 / FAQ
Driveways questions
How long before I can drive on a new driveway?
Foot traffic is usually fine after a day or two. Cars need to wait longer while the concrete gains strength. Your contractor will give you a timeline based on the mix and the weather.
Should my driveway be reinforced?
Most contractors use rebar or wire mesh, fibers, or a mix of these. Ask what they plan to use and why.
Do I need a permit?
Many areas need a permit for new driveways or changes to the curb cut. Your contractor should know the local rules.
Do driveways work?
Add your company to the directory and show homeowners the work you do best.